Solar engineering in Faisalabad
AEDB & PEC approved · Serving Faisalabad

Industrial solar EPC for Faisalabad’s textile and manufacturing sector

Skyland Energy serves Faisalabad from its Lahore head office with rooftop solar, PV–generator synchronization, and grid-connection support built around the daytime loads of spinning, weaving, and processing plants.

FESCO

Distribution company

1,450

kWh per kWp per year (planning yield)

Up to 1 MW

Net-billing system limit

From Lahore

Engineering team visits

Regional Coverage

Areas we serve in Faisalabad

Typical sites and solution types in and around Faisalabad. Every system is designed after a site survey.

Textile hub

Khurrianwala industrial corridor

Large shed roofs on weaving, spinning, and printing units suit high-capacity rooftop systems.

Special economic zone

M-3 Industrial City & FIEDMC

Newer facilities where solar can be planned alongside transformers, metering, and monitoring from the start.

Textile processing

Jhang Road & Sargodha Road belts

Processing plants where humidity, chemical vapour, and dust affect equipment selection and cleaning plans.

Light manufacturing

Small Industries Estate

Systems of roughly 50–500 kW sized to roof space and sanctioned load.

Commercial & retail

D-Ground, Kohinoor & People’s Colony

Rooftop systems that offset daytime air-conditioning and lighting in plazas and shops.

Utility Analysis: FESCO (Faisalabad Electric Supply Company)

FESCO industrial tariffs and daytime textile loads

Energy is one of the largest costs in Faisalabad textile production. Mills that run day shifts can use most of their solar output on site, which is where solar saves the full FESCO rate. Because exported units now earn only about PKR 11 under net billing, systems are best sized to the plant’s daytime demand rather than its total monthly consumption.

Planning tariffs used by our calculator

FESCO: about PKR 54 (industrial), 72 (commercial), and 62 (residential) per unit. Your own bill gives the exact rate.

Net-billing grid connection

Documentation and coordination with FESCO under the NEPRA Prosumer Regulations 2026: sanctioned-load checks, load-flow studies for 250 kW and above, inspection, and metering.

What Skyland delivers in Faisalabad

Large textile rooftop systems

Layouts with maintenance walkways, string monitoring, and safe access for regular module cleaning.

PV–diesel and gas hybrid control

Integration with existing generators so solar can keep contributing during load-shedding without reverse power.

FESCO interconnection support

Coordination of 11 kV connection documentation, protection settings, and metering with FESCO.

Heat- and dust-aware design

Module, inverter, and ventilation choices that account for hot summers and dusty sites.

Solar savings estimator

Estimate solar for your Faisalabad site

Enter your monthly bill or units to see an indicative system size, savings, and payback using FESCO planning rates and net billing.

Solar savings calculator

Estimate your solar size and savings

Updated for net billing under the NEPRA Prosumer Regulations 2026.

01. Facility type
02. Electricity company (DISCO)Tariff used: PKR 54/unit

Most DISCOs share the national uniform tariff, so the main difference between them here is local solar yield. For the most accurate result, enter the per-unit rate from your own bill under advanced options.

03. Monthly electricity use

Quick select:
80%
30%Daytime use ≈ 75%100%
Indicative system
220 kWpSized to your load

~26,583 units per month · covers ~80% of your use

Used on site: 94%Exported at ~PKR 11: 6%

Monthly savings

PKR 1,164,917

~65% of your bill
Annual savings

PKR 1.40 Crore

First year
Payback

~1.2 years

Includes O&M costs
25-year net value

PKR 69.68 Crore

After O&M and inverter
Indicative turnkey costPKR 1.58 Crore – 1.94 Crore
Roof area needed~14,300 sq. ft.
  • Grid-connected capacity cannot exceed your sanctioned load. Check it on your bill.

Grid connection: New connections fall under NEPRA Prosumer Regulations 2026: exports are credited at about PKR 11/unit and imports are billed at your normal tariff. Approval depends on DISCO review and transformer capacity.

~197.8 t CO₂ avoided per year (≈ 8,901 trees)

How this estimate works
  • Generation uses 1450 kWh per kWp per year for FESCO, after typical heat, dust, and inverter losses.
  • Solar first serves your daytime use (75% of consumption). Each self-used unit avoids about 85% of your average rate, because fixed and demand charges stay.
  • Surplus units are exported at about PKR 11/unit under net billing (NEPRA Prosumer Regulations 2026, notified 9 February 2026).
  • Cost uses indicative on-grid turnkey rates of PKR 72,000–88,000 per kWp, without batteries.
  • The 25-year value assumes 6% yearly tariff growth, 0.5% yearly panel degradation, O&M at 1% of cost per year, and an inverter replacement in year 12.
  • This is a preliminary estimate, not a quotation. A site survey confirms the final design.
Frequently Asked Questions

Solar in Faisalabad: Common Questions

Tariffs, FESCO grid connection, and engineering questions we are often asked.

Plan your solar investment in Faisalabad with Skyland Energy.

Schedule a site assessment with our engineers. We evaluate your roof geometry, electrical load, FESCO connection, and commercial viability.