Industrial solar EPC for Faisalabad’s textile and manufacturing sector
Skyland Energy serves Faisalabad from its Lahore head office with rooftop solar, PV–generator synchronization, and grid-connection support built around the daytime loads of spinning, weaving, and processing plants.
FESCO
Distribution company
1,450
kWh per kWp per year (planning yield)
Up to 1 MW
Net-billing system limit
From Lahore
Engineering team visits
Regional Coverage
Areas we serve in Faisalabad
Typical sites and solution types in and around Faisalabad. Every system is designed after a site survey.
Khurrianwala industrial corridor
Large shed roofs on weaving, spinning, and printing units suit high-capacity rooftop systems.
M-3 Industrial City & FIEDMC
Newer facilities where solar can be planned alongside transformers, metering, and monitoring from the start.
Jhang Road & Sargodha Road belts
Processing plants where humidity, chemical vapour, and dust affect equipment selection and cleaning plans.
Small Industries Estate
Systems of roughly 50–500 kW sized to roof space and sanctioned load.
D-Ground, Kohinoor & People’s Colony
Rooftop systems that offset daytime air-conditioning and lighting in plazas and shops.
FESCO industrial tariffs and daytime textile loads
Energy is one of the largest costs in Faisalabad textile production. Mills that run day shifts can use most of their solar output on site, which is where solar saves the full FESCO rate. Because exported units now earn only about PKR 11 under net billing, systems are best sized to the plant’s daytime demand rather than its total monthly consumption.
Planning tariffs used by our calculator
FESCO: about PKR 54 (industrial), 72 (commercial), and 62 (residential) per unit. Your own bill gives the exact rate.
Net-billing grid connection
Documentation and coordination with FESCO under the NEPRA Prosumer Regulations 2026: sanctioned-load checks, load-flow studies for 250 kW and above, inspection, and metering.
What Skyland delivers in Faisalabad
Large textile rooftop systems
Layouts with maintenance walkways, string monitoring, and safe access for regular module cleaning.
PV–diesel and gas hybrid control
Integration with existing generators so solar can keep contributing during load-shedding without reverse power.
FESCO interconnection support
Coordination of 11 kV connection documentation, protection settings, and metering with FESCO.
Heat- and dust-aware design
Module, inverter, and ventilation choices that account for hot summers and dusty sites.
Estimate solar for your Faisalabad site
Enter your monthly bill or units to see an indicative system size, savings, and payback using FESCO planning rates and net billing.
Solar savings calculator
Estimate your solar size and savings
Updated for net billing under the NEPRA Prosumer Regulations 2026.
03. Monthly electricity use
~26,583 units per month · covers ~80% of your use
Used on site: 94%Exported at ~PKR 11: 6%
PKR 1,164,917
~65% of your billPKR 1.40 Crore
First year~1.2 years
Includes O&M costsPKR 69.68 Crore
After O&M and inverter- Grid-connected capacity cannot exceed your sanctioned load. Check it on your bill.
Grid connection: New connections fall under NEPRA Prosumer Regulations 2026: exports are credited at about PKR 11/unit and imports are billed at your normal tariff. Approval depends on DISCO review and transformer capacity.
~197.8 t CO₂ avoided per year (≈ 8,901 trees)
How this estimate works
- Generation uses 1450 kWh per kWp per year for FESCO, after typical heat, dust, and inverter losses.
- Solar first serves your daytime use (75% of consumption). Each self-used unit avoids about 85% of your average rate, because fixed and demand charges stay.
- Surplus units are exported at about PKR 11/unit under net billing (NEPRA Prosumer Regulations 2026, notified 9 February 2026).
- Cost uses indicative on-grid turnkey rates of PKR 72,000–88,000 per kWp, without batteries.
- The 25-year value assumes 6% yearly tariff growth, 0.5% yearly panel degradation, O&M at 1% of cost per year, and an inverter replacement in year 12.
- This is a preliminary estimate, not a quotation. A site survey confirms the final design.
Solar in Faisalabad: Common Questions
Tariffs, FESCO grid connection, and engineering questions we are often asked.
Many are, because they offer large unshaded areas. Each roof still needs a structural check of its purlins, sheeting, and wind loads before the mounting system is chosen.
Yes, with a PV–genset controller. It limits solar output so the generator stays above its minimum stable load and never receives reverse power. How much of the load solar can carry depends on the generator type and settings.
It depends on the tariff, daytime load, system cost, and how much power is exported. Use the calculator below for a first estimate; Skyland confirms it with your bills and a site survey.
Yes. O&M can include monitoring review, scheduled cleaning, inspections, and fault response, agreed per project.
Other areas we serve from Lahore
Plan your solar investment in Faisalabad with Skyland Energy.
Schedule a site assessment with our engineers. We evaluate your roof geometry, electrical load, FESCO connection, and commercial viability.