Solar engineering in Islamabad & Rawalpindi
AEDB & PEC approved · Serving Islamabad & Rawalpindi

Solar EPC for Islamabad and Rawalpindi

Rooftop solar, carports, zero-export protection, and battery backup for corporate offices, institutions, healthcare facilities, and homes in the twin cities.

IESCO

Distribution company

1,400

kWh per kWp per year (planning yield)

Up to 1 MW

Net-billing system limit

From Lahore

Engineering team visits

Regional Coverage

Areas we serve in Islamabad & Rawalpindi

Typical sites and solution types in and around Islamabad & Rawalpindi. Every system is designed after a site survey.

Commercial buildings

Blue Area & commercial centres

Rooftop and elevated structures that keep terraces usable while generating daytime power.

Industrial & warehousing

I-9 & I-10 industrial sectors

Solar and backup for pharmaceutical, printing, food, and logistics facilities.

Manufacturing

Rawat & surrounding industrial areas

Grid-tied systems that reduce daytime production costs for Rawalpindi-side plants.

Institutions

Educational & healthcare campuses

Rooftop arrays and carports for schools, universities, and private hospitals.

Residential

DHA, Bahria Town & residential sectors

Three-phase systems, typically 10–30 kW, with optional lithium battery storage.

Utility Analysis: IESCO (Islamabad Electric Supply Company)

Getting the most from IESCO under net billing

Offices and institutions in the twin cities mostly use power during the day, which suits solar well. Since February 2026, new grid-connected systems are on net billing: exported units are bought at about PKR 11 while grid units are billed at the full tariff. Sizing to daytime demand, and adding batteries where evening use or backup matters, gives the strongest return.

Planning tariffs used by our calculator

IESCO: about PKR 54 (industrial), 72 (commercial), and 62 (residential) per unit. Your own bill gives the exact rate.

Net-billing grid connection

Documentation and coordination with IESCO under the NEPRA Prosumer Regulations 2026: sanctioned-load checks, load-flow studies for 250 kW and above, inspection, and metering.

What Skyland delivers in Islamabad & Rawalpindi

Office and plaza solar

Structural and electrical design that works around chillers, lifts, and UPS-backed server rooms.

IESCO grid-connection support

Documentation, sanctioned-load verification, metering, and commissioning coordination with IESCO.

Solar carports

Shaded parking that also generates power for the building, with EV-charging provisions if needed.

Battery backup (BESS)

Lithium iron phosphate storage sized to critical loads such as clinics, data rooms, and security systems.

Solar savings estimator

Estimate solar for your Islamabad & Rawalpindi site

Enter your monthly bill or units to see an indicative system size, savings, and payback using IESCO planning rates and net billing.

Solar savings calculator

Estimate your solar size and savings

Updated for net billing under the NEPRA Prosumer Regulations 2026.

01. Facility type
02. Electricity company (DISCO)Tariff used: PKR 54/unit

Most DISCOs share the national uniform tariff, so the main difference between them here is local solar yield. For the most accurate result, enter the per-unit rate from your own bill under advanced options.

03. Monthly electricity use

Quick select:
80%
30%Daytime use ≈ 75%100%
Indicative system
230 kWpSized to your load

~26,833 units per month · covers ~81% of your use

Used on site: 93%Exported at ~PKR 11: 7%

Monthly savings

PKR 1,167,667

~65% of your bill
Annual savings

PKR 1.40 Crore

First year
Payback

~1.3 years

Includes O&M costs
25-year net value

PKR 69.71 Crore

After O&M and inverter
Indicative turnkey costPKR 1.66 Crore – 2.02 Crore
Roof area needed~14,950 sq. ft.
  • Grid-connected capacity cannot exceed your sanctioned load. Check it on your bill.

Grid connection: New connections fall under NEPRA Prosumer Regulations 2026: exports are credited at about PKR 11/unit and imports are billed at your normal tariff. Approval depends on DISCO review and transformer capacity.

~199.6 t CO₂ avoided per year (≈ 8,982 trees)

How this estimate works
  • Generation uses 1400 kWh per kWp per year for IESCO, after typical heat, dust, and inverter losses.
  • Solar first serves your daytime use (75% of consumption). Each self-used unit avoids about 85% of your average rate, because fixed and demand charges stay.
  • Surplus units are exported at about PKR 11/unit under net billing (NEPRA Prosumer Regulations 2026, notified 9 February 2026).
  • Cost uses indicative on-grid turnkey rates of PKR 72,000–88,000 per kWp, without batteries.
  • The 25-year value assumes 6% yearly tariff growth, 0.5% yearly panel degradation, O&M at 1% of cost per year, and an inverter replacement in year 12.
  • This is a preliminary estimate, not a quotation. A site survey confirms the final design.
Frequently Asked Questions

Solar in Islamabad & Rawalpindi: Common Questions

Tariffs, IESCO grid connection, and engineering questions we are often asked.

Plan your solar investment in Islamabad & Rawalpindi with Skyland Energy.

Schedule a site assessment with our engineers. We evaluate your roof geometry, electrical load, IESCO connection, and commercial viability.