
Engineering-led solar EPC for Lahore’s industrial, commercial, and residential sites
From our Johar Town head office, Skyland Energy designs and builds rooftop solar, battery storage, and hybrid systems for LESCO customers, from Sundar and Quaid-e-Azam Industrial Estates to Gulberg, DHA, and homes across the city.
LESCO
Distribution company
1,420
kWh per kWp per year (planning yield)
Up to 1 MW
Net-billing system limit
Johar Town
Head office & engineering team
Regional Coverage
Areas we serve in Lahore
Typical sites and solution types in and around Lahore. Every system is designed after a site survey.
Sundar Industrial Estate
Large rooftop systems for textile, pharmaceutical, plastics, and engineering factories with heavy daytime loads.
Quaid-e-Azam Industrial Estate (Kot Lakhpat)
Solar sized against daytime motor and process loads, with protection coordinated to existing distribution.
Multan Road & Manga Mandi corridor
Metal, chemical, and agri-processing plants where solar often runs alongside generators.
Gulberg, MM Alam & Jail Road
Rooftop and zero-export systems for offices, hospitals, plazas, and retail buildings.
DHA Lahore & Cantt
Three-phase grid-connected systems, typically 10–100 kW, with optional lithium battery backup.
LESCO tariffs and the 2026 net-billing rules
Commercial and industrial LESCO bills carry high per-unit rates plus fuel and quarterly adjustments. Under the NEPRA Prosumer Regulations 2026, solar power you use on site avoids that full rate, while surplus units exported to the grid are bought back at only about PKR 11. The best-performing Lahore systems are therefore sized to daytime consumption, with batteries considered where evening or backup use matters.
Planning tariffs used by our calculator
LESCO: about PKR 54 (industrial), 72 (commercial), and 62 (residential) per unit. Your own bill gives the exact rate.
Net-billing grid connection
Documentation and coordination with LESCO under the NEPRA Prosumer Regulations 2026: sanctioned-load checks, load-flow studies for 250 kW and above, inspection, and metering.
What Skyland delivers in Lahore
Industrial rooftop EPC
Structural review, mounting suited to the roof type, module and inverter selection, protection design, and commissioning.
LESCO grid-connection support
Technical documentation, sanctioned-load checks, load-flow study coordination for systems of 250 kW or more, inspection, and meter commissioning.
PV–genset hybrid control
Controllers that let solar keep working with generators during load-shedding while protecting the generator from reverse power.
Energy audits & power quality
Measurements of load profile, harmonics, power factor, and phase balance before a system is sized.
Estimate solar for your Lahore site
Enter your monthly bill or units to see an indicative system size, savings, and payback using LESCO planning rates and net billing.
Solar savings calculator
Estimate your solar size and savings
Updated for net billing under the NEPRA Prosumer Regulations 2026.
03. Monthly electricity use
~3,905 units per month · covers ~80% of your use
Used on site: 81%Exported at ~PKR 11: 19%
PKR 201,573
~58% of your billPKR 24.19 Lakh
First year~1.2 years
Includes O&M costsPKR 11.89 Crore
After O&M and inverter- Grid-connected capacity cannot exceed your sanctioned load. Check it on your bill.
Grid connection: New connections fall under NEPRA Prosumer Regulations 2026: exports are credited at about PKR 11/unit and imports are billed at your normal tariff. Approval depends on DISCO review and transformer capacity.
~29.1 t CO₂ avoided per year (≈ 1,310 trees)
How this estimate works
- Generation uses 1420 kWh per kWp per year for LESCO, after typical heat, dust, and inverter losses.
- Solar first serves your daytime use (65% of consumption). Each self-used unit avoids about 85% of your average rate, because fixed and demand charges stay.
- Surplus units are exported at about PKR 11/unit under net billing (NEPRA Prosumer Regulations 2026, notified 9 February 2026).
- Cost uses indicative on-grid turnkey rates of PKR 80,000–98,000 per kWp, without batteries.
- The 25-year value assumes 6% yearly tariff growth, 0.5% yearly panel degradation, O&M at 1% of cost per year, and an inverter replacement in year 12.
- This is a preliminary estimate, not a quotation. A site survey confirms the final design.
Solar in Lahore: Common Questions
Tariffs, LESCO grid connection, and engineering questions we are often asked.
It varies with the application queue, the site’s sanctioned load, and transformer capacity. Systems of 250 kW or more also need a load-flow study. Skyland prepares the technical submissions and coordinates inspection and meter installation, and gives a realistic timeline after reviewing your connection.
Often, yes. Many standing-seam and trapezoidal sheet roofs can use clamp-based mounting. The right method depends on the roof profile, its condition, wind loading, and the roof manufacturer’s requirements, which Skyland checks during the structural review.
Our head office is at 286, Block H-1, Johar Town, Lahore. Office hours are Monday to Saturday, 9:00 AM to 6:00 PM. Please call ahead so the right engineer is available.
Equipment is selected per project from established module, inverter, and storage manufacturers, such as those shown on our partners list, based on the site, budget, and warranty requirements. Warranty terms are those offered by each manufacturer and are stated in the proposal.
Other areas we serve from Lahore
Plan your solar investment in Lahore with Skyland Energy.
Schedule a site assessment with our engineers. We evaluate your roof geometry, electrical load, LESCO connection, and commercial viability.