Solar engineering in Lahore
AEDB & PEC approved · Serving Lahore

Engineering-led solar EPC for Lahore’s industrial, commercial, and residential sites

From our Johar Town head office, Skyland Energy designs and builds rooftop solar, battery storage, and hybrid systems for LESCO customers, from Sundar and Quaid-e-Azam Industrial Estates to Gulberg, DHA, and homes across the city.

LESCO

Distribution company

1,420

kWh per kWp per year (planning yield)

Up to 1 MW

Net-billing system limit

Johar Town

Head office & engineering team

Regional Coverage

Areas we serve in Lahore

Typical sites and solution types in and around Lahore. Every system is designed after a site survey.

Industrial hub

Sundar Industrial Estate

Large rooftop systems for textile, pharmaceutical, plastics, and engineering factories with heavy daytime loads.

Manufacturing zone

Quaid-e-Azam Industrial Estate (Kot Lakhpat)

Solar sized against daytime motor and process loads, with protection coordinated to existing distribution.

Processing belt

Multan Road & Manga Mandi corridor

Metal, chemical, and agri-processing plants where solar often runs alongside generators.

Commercial centres

Gulberg, MM Alam & Jail Road

Rooftop and zero-export systems for offices, hospitals, plazas, and retail buildings.

Commercial & residential

DHA Lahore & Cantt

Three-phase grid-connected systems, typically 10–100 kW, with optional lithium battery backup.

Utility Analysis: LESCO (Lahore Electric Supply Company)

LESCO tariffs and the 2026 net-billing rules

Commercial and industrial LESCO bills carry high per-unit rates plus fuel and quarterly adjustments. Under the NEPRA Prosumer Regulations 2026, solar power you use on site avoids that full rate, while surplus units exported to the grid are bought back at only about PKR 11. The best-performing Lahore systems are therefore sized to daytime consumption, with batteries considered where evening or backup use matters.

Planning tariffs used by our calculator

LESCO: about PKR 54 (industrial), 72 (commercial), and 62 (residential) per unit. Your own bill gives the exact rate.

Net-billing grid connection

Documentation and coordination with LESCO under the NEPRA Prosumer Regulations 2026: sanctioned-load checks, load-flow studies for 250 kW and above, inspection, and metering.

What Skyland delivers in Lahore

Industrial rooftop EPC

Structural review, mounting suited to the roof type, module and inverter selection, protection design, and commissioning.

LESCO grid-connection support

Technical documentation, sanctioned-load checks, load-flow study coordination for systems of 250 kW or more, inspection, and meter commissioning.

PV–genset hybrid control

Controllers that let solar keep working with generators during load-shedding while protecting the generator from reverse power.

Energy audits & power quality

Measurements of load profile, harmonics, power factor, and phase balance before a system is sized.

Solar savings estimator

Estimate solar for your Lahore site

Enter your monthly bill or units to see an indicative system size, savings, and payback using LESCO planning rates and net billing.

Solar savings calculator

Estimate your solar size and savings

Updated for net billing under the NEPRA Prosumer Regulations 2026.

01. Facility type
02. Electricity company (DISCO)Tariff used: PKR 72/unit

Most DISCOs share the national uniform tariff, so the main difference between them here is local solar yield. For the most accurate result, enter the per-unit rate from your own bill under advanced options.

03. Monthly electricity use

Quick select:
80%
30%Daytime use ≈ 65%100%
Indicative system
33 kWpSized to your load

~3,905 units per month · covers ~80% of your use

Used on site: 81%Exported at ~PKR 11: 19%

Monthly savings

PKR 201,573

~58% of your bill
Annual savings

PKR 24.19 Lakh

First year
Payback

~1.2 years

Includes O&M costs
25-year net value

PKR 11.89 Crore

After O&M and inverter
Indicative turnkey costPKR 26.40 Lakh – 32.34 Lakh
Roof area needed~2,145 sq. ft.
  • Grid-connected capacity cannot exceed your sanctioned load. Check it on your bill.

Grid connection: New connections fall under NEPRA Prosumer Regulations 2026: exports are credited at about PKR 11/unit and imports are billed at your normal tariff. Approval depends on DISCO review and transformer capacity.

~29.1 t CO₂ avoided per year (≈ 1,310 trees)

How this estimate works
  • Generation uses 1420 kWh per kWp per year for LESCO, after typical heat, dust, and inverter losses.
  • Solar first serves your daytime use (65% of consumption). Each self-used unit avoids about 85% of your average rate, because fixed and demand charges stay.
  • Surplus units are exported at about PKR 11/unit under net billing (NEPRA Prosumer Regulations 2026, notified 9 February 2026).
  • Cost uses indicative on-grid turnkey rates of PKR 80,000–98,000 per kWp, without batteries.
  • The 25-year value assumes 6% yearly tariff growth, 0.5% yearly panel degradation, O&M at 1% of cost per year, and an inverter replacement in year 12.
  • This is a preliminary estimate, not a quotation. A site survey confirms the final design.
Frequently Asked Questions

Solar in Lahore: Common Questions

Tariffs, LESCO grid connection, and engineering questions we are often asked.

Plan your solar investment in Lahore with Skyland Energy.

Schedule a site assessment with our engineers. We evaluate your roof geometry, electrical load, LESCO connection, and commercial viability.