Industrial solar EPC for Gujranwala and Sialkot manufacturers
Rooftop solar and power-quality engineering that lowers daytime energy costs for export manufacturers, and helps document renewable energy use for buyers who ask for it.
GEPCO
Distribution company
1,400
kWh per kWp per year (planning yield)
Up to 1 MW
Net-billing system limit
From Lahore
Engineering team visits
Regional Coverage
Areas we serve in Gujranwala & Sialkot
Typical sites and solution types in and around Gujranwala & Sialkot. Every system is designed after a site survey.
Sialkot Export Processing Zone & Sambrial
Rooftop systems for surgical instrument, leather goods, and sports equipment exporters.
Small Industries Estates, Sialkot
Solar for CNC, cutting, and stitching operations that need stable voltage and power factor.
Gujranwala Industrial Estate
Larger systems for ceramics, sanitaryware, aluminium extrusion, and appliance factories.
Daska Road & Wazirabad corridors
Rooftop solar and power stabilization for small and mid-sized workshops.
Cantt & city commercial centres
Rooftop systems for showrooms, export offices, banks, and retail outlets.
Export competitiveness and GEPCO costs
Many Sialkot and Gujranwala exporters are asked by international buyers about energy use and emissions. On-site solar lowers daytime GEPCO costs and produces metered generation data that can support those reports. Under the 2026 net-billing rules, the savings come mainly from power used on site, so systems are sized to daytime production loads.
Planning tariffs used by our calculator
GEPCO: about PKR 54 (industrial), 72 (commercial), and 62 (residential) per unit. Your own bill gives the exact rate.
Net-billing grid connection
Documentation and coordination with GEPCO under the NEPRA Prosumer Regulations 2026: sanctioned-load checks, load-flow studies for 250 kW and above, inspection, and metering.
What Skyland delivers in Gujranwala & Sialkot
Generation data for buyer reporting
Monitoring that records solar generation, which can be used in supplier energy and emissions reporting.
Heavy-machinery integration
Power-quality design that accounts for motor inrush currents, avoids nuisance inverter trips, and keeps power factor in range.
GEPCO grid-connection support
Sanctioned-load matching, application documentation, and coordination of inspection and metering with GEPCO.
Zero-export systems
Dynamic export limiting for sites that are awaiting grid approval or run on dedicated transformers.
Estimate solar for your Gujranwala & Sialkot site
Enter your monthly bill or units to see an indicative system size, savings, and payback using GEPCO planning rates and net billing.
Solar savings calculator
Estimate your solar size and savings
Updated for net billing under the NEPRA Prosumer Regulations 2026.
03. Monthly electricity use
~26,833 units per month · covers ~81% of your use
Used on site: 93%Exported at ~PKR 11: 7%
PKR 1,167,667
~65% of your billPKR 1.40 Crore
First year~1.3 years
Includes O&M costsPKR 69.71 Crore
After O&M and inverter- Grid-connected capacity cannot exceed your sanctioned load. Check it on your bill.
Grid connection: New connections fall under NEPRA Prosumer Regulations 2026: exports are credited at about PKR 11/unit and imports are billed at your normal tariff. Approval depends on DISCO review and transformer capacity.
~199.6 t CO₂ avoided per year (≈ 8,982 trees)
How this estimate works
- Generation uses 1400 kWh per kWp per year for GEPCO, after typical heat, dust, and inverter losses.
- Solar first serves your daytime use (75% of consumption). Each self-used unit avoids about 85% of your average rate, because fixed and demand charges stay.
- Surplus units are exported at about PKR 11/unit under net billing (NEPRA Prosumer Regulations 2026, notified 9 February 2026).
- Cost uses indicative on-grid turnkey rates of PKR 72,000–88,000 per kWp, without batteries.
- The 25-year value assumes 6% yearly tariff growth, 0.5% yearly panel degradation, O&M at 1% of cost per year, and an inverter replacement in year 12.
- This is a preliminary estimate, not a quotation. A site survey confirms the final design.
Solar in Gujranwala & Sialkot: Common Questions
Tariffs, GEPCO grid connection, and engineering questions we are often asked.
Solar generation data from a monitored system can support energy and emissions disclosures that some buyers request. Skyland can set up monitoring and reporting; what counts toward a specific buyer’s programme is set by that buyer.
Yes, when designed for it. Skyland reviews the single-line diagram and load behaviour, sizes inverters with suitable headroom, and adds power-factor correction where it is needed.
Site survey and structural check, design, GEPCO application with technical documents (plus a load-flow study for 250 kW and above), inspection, meter installation, and activation. Skyland prepares and coordinates each step.
Yes. Our engineers travel from the Lahore office for surveys, installation, and maintenance visits, scheduled with each client.
Other areas we serve from Lahore
Plan your solar investment in Gujranwala & Sialkot with Skyland Energy.
Schedule a site assessment with our engineers. We evaluate your roof geometry, electrical load, GEPCO connection, and commercial viability.