Solar engineering in Gujranwala & Sialkot
AEDB & PEC approved · Serving Gujranwala & Sialkot

Industrial solar EPC for Gujranwala and Sialkot manufacturers

Rooftop solar and power-quality engineering that lowers daytime energy costs for export manufacturers, and helps document renewable energy use for buyers who ask for it.

GEPCO

Distribution company

1,400

kWh per kWp per year (planning yield)

Up to 1 MW

Net-billing system limit

From Lahore

Engineering team visits

Regional Coverage

Areas we serve in Gujranwala & Sialkot

Typical sites and solution types in and around Gujranwala & Sialkot. Every system is designed after a site survey.

Export processing

Sialkot Export Processing Zone & Sambrial

Rooftop systems for surgical instrument, leather goods, and sports equipment exporters.

Precision manufacturing

Small Industries Estates, Sialkot

Solar for CNC, cutting, and stitching operations that need stable voltage and power factor.

Heavy engineering

Gujranwala Industrial Estate

Larger systems for ceramics, sanitaryware, aluminium extrusion, and appliance factories.

Cutlery & light engineering

Daska Road & Wazirabad corridors

Rooftop solar and power stabilization for small and mid-sized workshops.

Commercial & retail

Cantt & city commercial centres

Rooftop systems for showrooms, export offices, banks, and retail outlets.

Utility Analysis: GEPCO (Gujranwala Electric Power Company)

Export competitiveness and GEPCO costs

Many Sialkot and Gujranwala exporters are asked by international buyers about energy use and emissions. On-site solar lowers daytime GEPCO costs and produces metered generation data that can support those reports. Under the 2026 net-billing rules, the savings come mainly from power used on site, so systems are sized to daytime production loads.

Planning tariffs used by our calculator

GEPCO: about PKR 54 (industrial), 72 (commercial), and 62 (residential) per unit. Your own bill gives the exact rate.

Net-billing grid connection

Documentation and coordination with GEPCO under the NEPRA Prosumer Regulations 2026: sanctioned-load checks, load-flow studies for 250 kW and above, inspection, and metering.

What Skyland delivers in Gujranwala & Sialkot

Generation data for buyer reporting

Monitoring that records solar generation, which can be used in supplier energy and emissions reporting.

Heavy-machinery integration

Power-quality design that accounts for motor inrush currents, avoids nuisance inverter trips, and keeps power factor in range.

GEPCO grid-connection support

Sanctioned-load matching, application documentation, and coordination of inspection and metering with GEPCO.

Zero-export systems

Dynamic export limiting for sites that are awaiting grid approval or run on dedicated transformers.

Solar savings estimator

Estimate solar for your Gujranwala & Sialkot site

Enter your monthly bill or units to see an indicative system size, savings, and payback using GEPCO planning rates and net billing.

Solar savings calculator

Estimate your solar size and savings

Updated for net billing under the NEPRA Prosumer Regulations 2026.

01. Facility type
02. Electricity company (DISCO)Tariff used: PKR 54/unit

Most DISCOs share the national uniform tariff, so the main difference between them here is local solar yield. For the most accurate result, enter the per-unit rate from your own bill under advanced options.

03. Monthly electricity use

Quick select:
80%
30%Daytime use ≈ 75%100%
Indicative system
230 kWpSized to your load

~26,833 units per month · covers ~81% of your use

Used on site: 93%Exported at ~PKR 11: 7%

Monthly savings

PKR 1,167,667

~65% of your bill
Annual savings

PKR 1.40 Crore

First year
Payback

~1.3 years

Includes O&M costs
25-year net value

PKR 69.71 Crore

After O&M and inverter
Indicative turnkey costPKR 1.66 Crore – 2.02 Crore
Roof area needed~14,950 sq. ft.
  • Grid-connected capacity cannot exceed your sanctioned load. Check it on your bill.

Grid connection: New connections fall under NEPRA Prosumer Regulations 2026: exports are credited at about PKR 11/unit and imports are billed at your normal tariff. Approval depends on DISCO review and transformer capacity.

~199.6 t CO₂ avoided per year (≈ 8,982 trees)

How this estimate works
  • Generation uses 1400 kWh per kWp per year for GEPCO, after typical heat, dust, and inverter losses.
  • Solar first serves your daytime use (75% of consumption). Each self-used unit avoids about 85% of your average rate, because fixed and demand charges stay.
  • Surplus units are exported at about PKR 11/unit under net billing (NEPRA Prosumer Regulations 2026, notified 9 February 2026).
  • Cost uses indicative on-grid turnkey rates of PKR 72,000–88,000 per kWp, without batteries.
  • The 25-year value assumes 6% yearly tariff growth, 0.5% yearly panel degradation, O&M at 1% of cost per year, and an inverter replacement in year 12.
  • This is a preliminary estimate, not a quotation. A site survey confirms the final design.
Frequently Asked Questions

Solar in Gujranwala & Sialkot: Common Questions

Tariffs, GEPCO grid connection, and engineering questions we are often asked.

Plan your solar investment in Gujranwala & Sialkot with Skyland Energy.

Schedule a site assessment with our engineers. We evaluate your roof geometry, electrical load, GEPCO connection, and commercial viability.